10.9 C
Beijing

AUTHOR NAME

yang, hongqing

109 POSTS
0 COMMENTS

Zhong Baoshen, chairman and general manager of Longji Green Energy, CCTV’s New Year’s Voice: Photovoltaic Winter Is an Opportunity to Break the Board and...

However, Zhong Baoshen immediately conveyed his firm belief that the cold winter of the industry is not the end, but a "screening of big waves and sand" and "an opportunity to break the situation and rebirth". Secondly, Zhong Baoshen believes that technology is the core engine of breaking the game, and the bottom innovation and scene innovation need to go hand in hand. Looking ahead, despite the short-term pressure on the industry, Zhong Baoshen is still confident in the future of Longji and China PV. Zhong Baoshen appealed on the 2025 CCTV Finance New Year's Eve, "In the new year, I hope we can all show the courage to open roads in the mountains and build bridges in the water, and strive to paddle in the middle of the photovoltaic industry and break the game bravely."

Two ministries have issued a document concerning the rights and interests of the photovoltaic industry.

Source/National Intellectual Property AdministrationNational Intellectual Property Administration Ministry of Industry and Information TechnologyOpinions on Further Strengthening Intellectual Property Protection in the Photovoltaic IndustryNo. 41,...

Gansu 200 MW/800 MWh Energy Storage Project EPC Tender

Project Overview and Bidding Scope:(1) Construction of one new standalone energy storage power station with a capacity of 200 MW/800 MWh using lithium iron...

The aggregate processing system at the Huanglong Pumped Storage Hydropower Station in Gansu Province successfully completed single-unit commissioning on the first attempt.

On December 30, the sand and gravel processing system for the lower reservoir at the Huanglong Pumped Storage Hydropower Station in Gansu Province, constructed...

The No. 1 construction adit of the Dehua Pumped Storage Hydropower Station in Fujian Province has successfully entered the tunnel.

On December 31, the No. 1 construction adit of the Dehua Pumped Storage Hydropower Station in Fujian Province was successfully driven into the mountain,...

The main construction of the Fengquan Pingshang Pumped Storage Hydropower Project in Guizhou has officially commenced.

As the old year gives way to the new, the main construction works for water conveyance and power generation, including civil works and installation...

The 100 MW/200 MWh energy storage power station project in Qinghe, Hebei Province has successfully been connected to the grid.

At 19:00 on February 30, the Qinghe Ruizhu 100 MW/200 MWh energy storage power station project—the key initiative for building a new power system...

The first arrays of two photovoltaic projects in Wenshan Prefecture, Yunnan Province, have been connected to the grid and begun generating power.

On December 30, the 60 MW Minghu and 40 MW Sanjiazhai photovoltaic projects in Wenshan Prefecture, Yunnan Province, undertaken by the Engineering Bureau, successfully...

January: Peak-time electricity prices were implemented in 21 regions, with Shanghai’s price differential exceeding RMB 1.3 per kWh.

Four regions have retained valley-time electricity prices, while the peak-valley price differentials among regions have become markedly divergent. The peak–valley price spread has exceeded...

Latest news