On September 26, the Feidong Jingying 100MW/200MWh energy storage project, invested and constructed by Jinko Power (601778.SH), was successfully connected to the grid. Located in the Feidong Hefei Circular Economy Park, the project covers a site area of 1.6 hectares and includes the construction of a 110kV booster station and an integrated control building. The energy storage facility is equipped with 40 lithium iron phosphate energy storage battery systems. A single charge-discharge cycle of the energy storage system can store and release nearly 200,000 kWh of electricity, equivalent to providing one hour of peak electricity supply for tens of thousands of households.
