on April 9, the EPC tender announcement for the 100MW/200MWh hydrogen power sharing energy storage project in Wucheng, Dezhou, Shandong province was released.
the project is located on the west side of G240 in Wucheng county and north of 220kV jiande station in the national grid. it covers an area of about 23.5 mu and has a total scale of 100MW/200MWh, including 99MW/198MWh of lithium iron phosphate battery energy storage and 1MW/2MWh of hydrogen production and fuel cell energy storage.
The bidding scope includes the design of energy storage power station and booster station, equipment procurement, construction and installation, commissioning, grid connection, various coordination and acceptance, etc. The construction period is required to complete the grid connection acceptance from the date of signing the contract to July 31, 2026, and the project is subject to consortium bidding.