16.9 C
Beijing

Southern Xinjiang “super charging treasure” lights up the Gobi! China Construction Eighth Bureau to build domestic leading energy storage power station grid power generation

recently, with the dispatch order issued, the Yecheng 200000 kw/800000 kwh network energy storage project constructed by the eighth bureau of China construction has realized full capacity grid connection. This “power granary”, which stands at the northern foot of the Kunlun Mountains, is continuously inputting green power into the national grid, injecting strong power into the frontier energy transformation.

Related

Module Shipment Ranking

Industry Prices

Join Our Newsletter

You might also like

Follow Solarbe Global on Google News