23.9 C
Beijing

Jiangsu linyang Energy Co., Ltd. 2026 Annual Energy Storage, Photovoltaic Power Station Project Equipment Material Collection Recruitment Announcement

Jiangsu linyang energy co., ltd. is now openly recruiting equipment and material collection for 2026 energy storage and photovoltaic power station projects. new and old manufacturers or suppliers are welcome to participate in the registration.

brief introduction of 1. project:

1, recruitment type:

Jiangsu linyang energy co., ltd. 2026 energy storage, photovoltaic power station project equipment and material collection recruitment;

2, recruitment content:

2.1 energy storage power station project:

project scale: planned 8GWh;

project place: tentative domestic (6GWh), tentative foreign (2GWh);

recruitment materials: DC side materials (rubber strip, heat insulation pad, aluminum end plate, steel strip, die cutting, sheet metal parts, connectors, fuses, CCS, BMS, liquid cooling plate, screws, bus cabinet, high pressure box, wire harness, copper bar, MSD, plastic upper cover), container body, liquid cooling unit, fire fighting system, liquid cooling pipeline, industrial air conditioner, industrial dehumidifier, PCS all-in-one machine, EMS, industrial and commercial cabinet.

2.2 photovoltaic power station project

project scale: planned 500MW;

project site: Jiangsu, Anhui, Shanghai, Shandong, Guangdong, Hainan, etc.

recruitment materials: photovoltaic bracket, box transformer, switch cabinet, prefabricated cabin, cable (aluminum alloy copper cable photovoltaic line).

qualification requirements for 2. registration units:

2.1, with independent legal personality and corresponding business scope;

2.2, with corresponding bidding equipment type test reports, material inspection reports and project performance in the past three years;

2.3, registered in the People’s Republic of China, no bad behavior record in the industry in the past three years;

2.4, with a safety production license within the validity period;

2.5, in line with other requirements stipulated by relevant laws and regulations.

3. registration time and contact information:

please pay attention to jilin official website to download the “supplier registration form” and send it to the registration mailbox before the deadline for registration of all equipment and materials. (Note: The title of the mail and the naming of the document should be noted as “Company Name: Lin Yang Energy Storage and Photovoltaic Power Station Project * * Equipment and Materials Registration Form”.)

deadline for registration: April 18, 2026, 16:00

contact person: manager Meng

contact number: 15852145332

registration email: xnyjcb@linyang.com

special note: this announcement is only an invitation for registration, and the supplier will be subject to qualification examination after registration, passing the qualification examination is not regarded as obtaining the bidding qualification, and the requirements of the tender documents of the recruiter shall prevail in the end.

Related

Module Shipment Ranking

Industry Prices

Join Our Newsletter

You might also like

Follow Solarbe Global on Google News