Recently, Anhui Xuancheng Kelante New Materials Co., Ltd. 3750kW/7830kWh energy storage project is bidding.
project name: 3750kW/7830kWh energy storage project of Xuancheng kolante new materials co., ltd
name of project approval, approval or filing authority: Xuancheng economic and technological development zone management Committee;
name and number of approval document: filing form 2511-341861-04-01-987373 of Xuancheng economic and technological development zone management Committee;
;
source of funds: state-owned enterprises;
project contribution ratio: 100;
description of the proposed bidding project: this project is equipped with a new 3750kW/7830kWh outdoor liquid cooling and energy storage system, with a total area of about 300 square meters. it is planned to be installed in the idle space in the red line of Xuancheng klante new materials co., ltd. with a total capacity of 7830kWh, the construction period of the project is 150 days. After the completion of the project, it mainly provides users with charging and discharging services. The role of energy storage is to cut peaks and fill valleys, reduce users’ electricity consumption costs and reduce the pressure of the power grid during peak electricity consumption. The dispatching principle is charging during low electricity prices and discharging during high electricity prices. Self-storage and self-use do not generate electricity online. The project adopts 10kV high voltage grid connection.
the implementation contents include but not limited to: the project adopts EPC mode, and the winning bidder must complete the project design, procurement, construction and other work, but not limited to the following contents: the project scheme design, equipment procurement, civil engineering and equipment installation and construction, construction water, construction electricity, auxiliary works, safety facilities, grid connection, local relationship coordination and so on, as well as the supply and installation of all equipment and systems in this project, CMA and CNAS test reports, tests, debugging, trial operation, completion acceptance, performance examination and acceptance of the whole system grid-connected operation, power quality and power factor meeting the examination requirements of the power supply department, technology and after-sales service, personnel training, cooperation with virtual power plant access and providing free energy storage platform for Party A during the operation period, within 2 months after receiving Party A’s notice, access to the energy storage management platform designated by Party A until all the work completed in production is handed over.
budget amount of the project to be invited for bidding: 10.8054 million yuan. the quotation form of this project adopts rate quotation
qualification requirements of bidders
qualification requirements of bidders: 1. design qualification: comprehensive Grade A qualification for engineering design or Grade B and above qualification for engineering design and power industry or Grade C and above qualification for engineering design and power industry (power transmission engineering, power transformation engineering); 2. Construction qualification: with Grade III and above qualification for general contracting of power engineering construction and license for installation (repair and test) of power facilities (Grade III and above for installation, repair and test), and with effective safety production license, and in personnel, equipment, funds and other aspects of the corresponding construction capacity.
Bidder performance requirements: None.
qualification requirements for design director and construction director:
(1) qualification requirements for design director: the bidder to appoint a design director must have the qualification of registered electrical engineer.
(2) qualification requirements for construction manager: if you have the qualification of a registered construction engineer of grade ii or above in mechanical and electrical engineering major and are registered with the bidding unit, you must obtain a class B certificate for safe production, and you are not currently working in other projects or can withdraw from the project after winning the bid although you are working in other projects.
(3) The project manager is the same person as the person in charge of construction (or design).
performance requirements of design director and construction director:
(1) performance requirements of design director: none
(2) performance requirements of construction director: none
the bidder shall not have one of the following circumstances:
The administrative departments of the engineering construction industry at all levels or other departments in Xuancheng City exercise the administrative law enforcement authority in the field of engineering construction, and the bad behavior is still within the disclosure period until the deadline for bidding;
The bad behavior is recorded by the comprehensive management departments of public resources transactions at all levels in Xuancheng City and is still within the disclosure period until the deadline for bidding;
The administrative department in charge of the construction industry at or above the municipal level or the comprehensive management department of public resources trading that has been divided into districts has given explicit restrictions on bidding [no business to be undertaken or no market to be entered (cleared)] and is still within the restriction period until the deadline for bidding. (If the subsidiary of the bidder has a record of bad behavior, it shall not affect the bidding qualification of the bidder).
whether to accept the consortium:
yes, the following requirements shall be met: the consortium members (including the leader) shall not exceed 3 (including 1 design unit and 2 construction units). 1. All parties to the consortium must sign a valid consortium agreement according to the format specified in the bidding documents, and the leader of the consortium must be the construction unit; 2. All parties to the consortium shall have the corresponding qualifications and capabilities required to undertake the bidding project, that is, they shall have the qualifications and capabilities required to meet the division of labor of each member in the consortium agreement; 3. If the consortium agreement stipulates that the same professional division of labor shall be jointly undertaken by two or more units, all enterprises that jointly undertake the major shall determine their qualifications according to the principle of low but not high. 4. If the consortium agreement stipulates that different specialties shall be undertaken by different units respectively, the bidding qualification of the consortium shall be determined according to the professional qualification combination corresponding to each professional project divided by the division of labor. 5. If the consortium wins the bid, all parties to the consortium shall jointly sign a contract with the tenderee and bear joint and several liability to the tenderee for the winning project. When the consortium wins the bid and signs the contract with the tenderer, all members of the consortium shall sign and seal the contract. If one member of the consortium fails to sign and seal the contract or give up withdrawing, or if the composition of the consortium is inconsistent with the bidding at the time of signing the contract, the consortium shall be deemed to have breached the contract, and the tenderee shall have the right to refuse to award the consortium contract and shall investigate the responsibility of the consortium accordingly. 6. All parties to the consortium shall not bid separately in their own name, nor shall they participate in repeated bidding by other consortia in this bidding; 7. In addition to the relevant materials of the consortium agreement that need to be sealed by each member, the bidding documents need to be signed or sealed by the lead person. The bidding documents shall be obtained by the lead unit of the consortium, and the members of the consortium shall go through the warehousing formalities in a timely manner.