On April 13, the general contracting tender announcement for the virtual power plant energy storage power station project (EPC) was released.
the project has a planned land area of 25 mu and a total construction area of 10000 square meters. it mainly builds a 100MW/200MWh energy storage power station on the national grid side, introduces lithium iron phosphate battery, energy storage converter PCS, 35KV transformer, booster station, etc., and builds relevant public and auxiliary facilities.
This project allows consortium bidding.